$310,000
$319,000
2.8%For more information regarding the value of a property, please contact us for a free consultation.
4 Beds
2 Baths
1,732 SqFt
SOLD DATE : 04/02/2025
Key Details
Sold Price $310,000
Property Type Single Family Home
Sub Type Single Family Residence
Listing Status Sold
Purchase Type For Sale
Square Footage 1,732 sqft
Price per Sqft $178
MLS Listing ID 6623784
Sold Date 04/02/25
Bedrooms 4
Full Baths 1
Half Baths 1
Year Built 1925
Annual Tax Amount $3,014
Tax Year 2024
Contingent None
Lot Size 7,840 Sqft
Acres 0.18
Lot Dimensions 46x168
Property Sub-Type Single Family Residence
Property Description
Ideal combination of preserved character with modern function. This lovely stucco two story home offers replaced windows, roof, renovated kitchen, original hardwood trim and floors, newer oversized garage, storage shop and more. This Four Square, arts and crafts home has a beautiful functional kitchen with Quartz tops, modern subway back splash, under lit cabinetry, satin appliances, clothes shoot, workspace and storage, along with a laundry area. There is also a beautiful dining room and living area open to a sweet sunroom. A perfectly placed office / bedroom on the main floor with built-ins and views of the lovely yard. Upstairs via an open stairway you will find 3 bedrooms, a full bath and the most delightful oasis. You may use this space as your family room or pin it as a retreat. With panoramic views the lovely, landscaped yard and darling neighborhood, it's sure to be your fav spot. The basement offers much potential for future living space or extra storage needed. There is a half bath. This property offers it all, in pristine condition in a premier location. Walking distance to Roosevelt Elementary, West High and the Red Jacket Trail system. Additional garage offers extra a 288 sf of garage / shed area. Home has high end window treatments, Trane Furnace and CA, RO water system, sump pump, Maytag WD, Satin Steel Appliances. You will love the landscape, insulated garages, alley access and all the upgrades. Welcome Home to West Mankato.
Location
State MN
County Blue Earth
Zoning Residential-Single Family
Rooms
Basement Full, Concrete, Partially Finished, Stone/Rock, Storage Space, Unfinished
Dining Room Eat In Kitchen, Separate/Formal Dining Room
Interior
Heating Forced Air
Cooling Central Air
Fireplace No
Appliance Dryer, Exhaust Fan, Gas Water Heater, Range, Refrigerator, Washer, Water Softener Owned
Exterior
Parking Features Detached, Concrete, Garage Door Opener, Insulated Garage, No Int Access to Dwelling
Garage Spaces 3.0
Roof Type Asphalt
Building
Lot Description Many Trees
Story Two
Foundation 816
Sewer City Sewer/Connected
Water City Water/Connected
Level or Stories Two
Structure Type Stucco
New Construction false
Schools
School District Mankato
Read Less Info
Want to know what your home might be worth? Contact us for a FREE valuation!

Our team is ready to help you sell your home for the highest possible price ASAP







